Consent to withdraw CMP332 and Direction to raise a new CUSC modification proposal for new Transmission Demand Residual charges for the Targeted Charging Review (TCR)

On 25 March 2020 National Grid ESO requested our consent to withdraw CUSC Modification Proposal CMP332 ‘Transmission Demand Residual bandings and allocation (TCR)’ and to review the implementation timeline for the new Transmission Demand Residual (TDR) charges for the Targeted Charging Review (TCR). This letter includes our Consent to this withdrawal and a Direction to raise a new CUSC modification that (i) enables TDR charge reforms to be effective as of 1 April 2022 and (ii) complies with the 2019 TCR Direction in all other respects.

For more information about this post and how Energy Solutions can help with your Electricity, Gas, or Water, click on the links, or check out the contact details at the bottom of the page.